{"id":17,"date":"2019-03-08T14:19:17","date_gmt":"2019-03-08T13:19:17","guid":{"rendered":"https:\/\/import.brothersthemes.com\/nur\/?page_id=17"},"modified":"2022-05-03T09:58:42","modified_gmt":"2022-05-03T07:58:42","slug":"about","status":"publish","type":"page","link":"https:\/\/www.seewind.eu\/?page_id=17","title":{"rendered":"About Us"},"content":{"rendered":"<section class=\"wpb-content-wrapper\"><p>[vc_section el_class=&#8221;city-bg&#8221;][vc_row][vc_column][nur_section_heading]<\/p>\n<h2 style=\"text-align: center;\">Our History<\/h2>\n<p>[\/nur_section_heading][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-lg-5&#8243;][vc_column_text]SEEWIND Windenergiesysteme GmbH was founded in the pioneering years of the wind energy technology, back in 1991 by Mr. Gerd Seel, who is still the CEO of the company. In the early years, the company designed and constructed own SEEWIND wind energy turbines. In total 93 turbines were erected. SEEWIND is still servicing the productive existing fleet.<\/p>\n<p>The first SEEWIND turbine was built in October 1990. In the timespan between 1993 and 2002, the number of 85 turbines type SEEWIND 20\/110 and type 25\/132 and 8 turbines type SEEWIND 52\/750 were installed.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-lg-offset-2 vc_col-lg-5&#8243;][vc_column_text]The global distribution of the SW 20\/110 and SW 25\/132 turbines was as follows: 37 in Germany, 7 in Austria, 7 in Poland, 4 in North Korea, 1 in South Korea, 2 in Turkey, 25 in Italy, 1 in Belarus, and 2 turbines were installed in France. Even today, many of the SEEWIND turbines installed in the 1990s are still in operation.<\/p>\n<p>From the year 2000 on, SEEWIND Windenergiesysteme GmbH began to reorganize away from investing more in R&amp;D for the turbine itself and specialised in the planning, design and in the construction of foundations for wind turbines.[\/vc_column_text][\/vc_column][\/vc_row][\/vc_section][vc_row][vc_column][vc_single_image image=&#8221;589&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; style=&#8221;vc_box_shadow_3d&#8221;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">The first SEEWIND wind turbine from 1990 at the Walzbachtal site is still in operation.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_section el_class=&#8221;city-bg&#8221; css=&#8221;.vc_custom_1509861512678{padding-top: 0px !important;padding-right: 0px !important;padding-bottom: 0px !important;padding-left: 0px !important;background-color: #f9f9f9 !important;}&#8221;][vc_row][vc_column width=&#8221;1\/3&#8243;][nur_feature_box icon_font=&#8221;fontawesome&#8221; icon_fontawesome=&#8221;fa fa-leaf&#8221; layout=&#8221;large-icon icon-circle&#8221;]<\/p>\n<h3>Priority of the company is the struggle for efficiency<\/h3>\n<p>Agile and straightforward oriented teams bring the speed into the projects. Time planning and a well-structured program supports the efficiency and reduces the average length of stay on site.[\/nur_feature_box][\/vc_column][vc_column width=&#8221;1\/3&#8243;][nur_feature_box icon_font=&#8221;fontawesome&#8221; icon_fontawesome=&#8221;fa fa-bolt&#8221; layout=&#8221;large-icon icon-circle&#8221;]<\/p>\n<h3>Good machinery increases the working speed<\/h3>\n<p>The best selection of equipment satisfies our staff creates identification with the company. It favours the will to go for the last mile when the time is short.[\/nur_feature_box][\/vc_column][vc_column width=&#8221;1\/3&#8243;][nur_feature_box icon_font=&#8221;fontawesome&#8221; icon_fontawesome=&#8221;fa fa-recycle&#8221; layout=&#8221;large-icon icon-circle&#8221;]<\/p>\n<h3>We love clean energy, the Renewable energy<\/h3>\n<p>As one of the pioneers in the renewables SEEWIND keeps up their mind-set of saving resources. In all of what we do the question how to get more with fewer resources is on top of the list.[\/nur_feature_box][\/vc_column][\/vc_row][\/vc_section][vc_section][vc_row][vc_column][nur_section_heading decoration=&#8221;line&#8221;]<\/p>\n<h2 style=\"text-align: center;\">Our Numbers<\/h2>\n<p style=\"text-align: center;\">More than 30 years of experience gave SEEWIND the chance to build a stable customer portfolio. Our gained knowledge and the flexibility of our staff allow us to satisfy their most particular need. Some of our customers have been found through the daily business activities; others have followed the advice of colleagues and have trusted us for all these years. It is this trust of our customers in SEEWIND which is the great success for our team. THANK YOU!<\/p>\n<p>[\/nur_section_heading][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-md-3&#8243;][nur_counter_box number_text=&#8221;2200+&#8221;]<\/p>\n<h6><strong>Foundations built with solid reinforced concrete structures<\/strong><\/h6>\n<p>Both deep and raft foundations for even the tallest wind turbines and with adopted piling solutions to the different subsoil situations.[\/nur_counter_box][\/vc_column][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-md-3&#8243;][nur_counter_box number_text=&#8221;30+&#8221;]<\/p>\n<h6><strong>Years of company history<\/strong><\/h6>\n<p>Being perfectly networked in the renewable energy market throughout the decades provides process safety and sustainability for the company and the customers.[\/nur_counter_box][\/vc_column][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-md-3&#8243;][nur_counter_box number_text=&#8221;93+&#8221;]<\/p>\n<h6><strong>SEEWIND manufactured turbines installed<\/strong><\/h6>\n<p>The race for increasing hub heights and rotor diameter implied capital intensity which limited the number of turbines manufactured and cleared the way after the year 2000 for specialization.[\/nur_counter_box][\/vc_column][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-md-3&#8243;][nur_counter_box number_text=&#8221;9+&#8221;]<\/p>\n<h6><strong>Countries of business activity<\/strong><\/h6>\n<p>From across Europe over Belarus to the Korean peninsula (both North and South Korea) and hopefully more to come in the next future.[\/nur_counter_box][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row_content&#8221; equal_height=&#8221;yes&#8221; content_placement=&#8221;middle&#8221;][vc_column][vc_media_grid element_width=&#8221;3&#8243; grid_id=&#8221;vc_gid:1651564601187-a4d9c34c-37b5-9&#8243; include=&#8221;984,981,982,1001&#8243;][\/vc_column][\/vc_row][\/vc_section][vc_section css=&#8221;.vc_custom_1506539640633{background-color: #f9f9f9 !important;}&#8221;][vc_row][vc_column][nur_section_heading decoration=&#8221;line&#8221;]<\/p>\n<h2 style=\"text-align: center;\">Our Customers<\/h2>\n<p style=\"text-align: center;\">Wind Turbine Manufacturers, Utilities, Wind Farm Operators, Owner Groups, Investors &#8230;<\/p>\n<p>[\/nur_section_heading][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1506542103664{margin-top: 20px !important;}&#8221;][vc_column][nur_logo_box][\/vc_column][\/vc_row][\/vc_section][vc_section][vc_row][vc_column][nur_section_heading decoration=&#8221;line&#8221;]<\/p>\n<h2 style=\"text-align: center;\">Client Testimonials<\/h2>\n<p style=\"text-align: center;\">Our clients say it best. Read what they have to say about their experiences with SEEWIND<\/p>\n<p>[\/nur_section_heading][\/vc_column][\/vc_row][vc_row][vc_column][nur_testimonials_carousel posts_per_page=&#8221;2&#8243; layout=&#8221;cards-1&#8243; dots_nav=&#8221;hide&#8221;][\/vc_column][\/vc_row][\/vc_section][vc_row full_width=&#8221;stretch_row_content_no_spaces&#8221; css=&#8221;.vc_custom_1509860704783{background-image: url(https:\/\/www.seewind.eu\/wp-content\/uploads\/2017\/11\/free-bg.jpg?id=303) !important;background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221;][vc_column][nur_cta_box button_text=&#8221;Feed-back&#8221; button_class=&#8221;btn-secondary btn-large&#8221; el_class=&#8221;text-white&#8221;]<\/p>\n<h2 style=\"text-align: center;\">It took many good deeds to build that good reputation<\/h2>\n<p style=\"text-align: center;\">&#8230; and we are eager to keep it.<\/p>\n<p>[\/nur_cta_box][\/vc_column][\/vc_row]<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>[vc_section el_class=&#8221;city-bg&#8221;][vc_row][vc_column][nur_section_heading] Our History [\/nur_section_heading][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243; offset=&#8221;vc_col-lg-5&#8243;][vc_column_text]SEEWIND Windenergiesysteme GmbH was founded in the pioneering years of the wind energy technology, back in 1991 by Mr. Gerd Seel, who is still the CEO of the company. In the early years, the company designed and constructed own SEEWIND wind energy turbines. In total 93 turbines were erected. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-17","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.seewind.eu\/index.php?rest_route=\/wp\/v2\/pages\/17","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.seewind.eu\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.seewind.eu\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.seewind.eu\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.seewind.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17"}],"version-history":[{"count":53,"href":"https:\/\/www.seewind.eu\/index.php?rest_route=\/wp\/v2\/pages\/17\/revisions"}],"predecessor-version":[{"id":1163,"href":"https:\/\/www.seewind.eu\/index.php?rest_route=\/wp\/v2\/pages\/17\/revisions\/1163"}],"wp:attachment":[{"href":"https:\/\/www.seewind.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}